The beginning of excavation to a temporary grade prior to stabilization pile installation. June, 2021
View to the east from the northeast region of the site. The stabilization piles will be about 5 feet away from the surveyor's stakes. June, 2021
Excavation to the temporay grade and export of soils continues. June, 2021
Many loads of soil were exported from the site. July 2021
The excavation is progressing. July, 2021
The back-cut exposes fill, soil, and landslide depoits. The recently active scarp is to the left of the man with the water hose. July, 2021
Another view of the grading operation. July, 2021
Looks like an offset soil horizon at the recently active scarp. July, 2021
It still looks like an offset soil horizon at the recently active scarp. July, 2021
Phase 1 of the temporary excavation is almost complete. July, 2021
A bit more trimming is needed.
Five A-slot excavations ready for pile excavation. July 2021
Excavation of temporary slope above upslope stabilization pile row continues.